Friday, September 6, 2013

Air Conditioning. Tile Layout. Cabinet Hardware.



Stucco guy finished the stucco on the new addition (photos tomorrow). Looks fantastic. We have A/C on the 2nd and 3rd floor, now that it is 30 degrees at night. Joe spent a ton of time today installing beautiful kitchen hardware. Nice.








This is the lower temp of Steve's A/C tolerance. 

Tile rug. Who thinks of these things? CHC Designs, that's who.




Unpacking boxes

Plates in the cabinet



Look at those cabinet pulls!

So beautiful




No comments:

Post a Comment