Saturday, September 28, 2013

Back Stairs Set. Island Posts Set. Cook Top Hood Set.

View out back door

Back steps


Brad setting the posts


Look at that hood!



Making it perfect

Wednesday, September 25, 2013

Exterior Painting Done! Heat on the First Floor!

Seriously happy with our house painters. Local husband and wife team.








And there is heat in the office!

Floor ready for toilet placement but tile is needed behind.

Tuesday, September 17, 2013

What A Difference Some Paint Makes

Reminder: This is what the front of The Dump looked like in February:



This is what it looks like in September:


Pretty amazing. I'm pretty happy.

More photos:






And the tile guy has been busy

Master bath shower

So gorgeous

We're trying to figure it out.


Downstairs powder room. Counter and sink installed.


Sunday, September 15, 2013

A House Full of Workers

Plumber installed bar hardware

Brad's work on the back steps and landing



Plumber hooking up the gas line

Aimee and Dennis power wash the stucco before painting

Tile guy is doing a fantastic job

From mudroom into powder room

Deck and stairs by the end of Friday


Our long lost electrician stopped by on Saturday. It works!

Dishwasher: check



All the way to the back door


Monday, September 9, 2013

The Counter Tops are Here! The Counter Tops are Here!

The granite guys from RSK Granite are amazing! Need some granite? Go to them.

Microwave goes in niche above

Bar

This photo does not do this granite justice.

Master bath





My desk is moved in.

We have a kitchen sink and a faucet. And they work.

Not operational yet

Desk in place