Wednesday, May 1, 2013

Framing in kitchen, 2nd floor

Woo Hoo! Stuff's happening.
Adam's crew unloads framing materials and plywood for the floors up through the second floor. See that roof of the sun porch where the wood is being uploaded? Will be a master bedroom deck. Someday.

Couldn't get to the backyard with all the equipment blocking both sides of the house. Here is the subflooring of  the addition through the kitchen window.



Pantry, wall ovens in this corner

Plastic stained glass window: gone! This also used to be a door to the driveway.

View of addition subflooring from the second floor.


Unloading lumber. Look how pretty my Japanese maple is.

Very warm on the third floor today, so they opened a window. Couldn't get up there; too much activity.

No comments:

Post a Comment